Program

Thursday, May 15, 2008

09:20
               
On-line regulation of the solids circulation rate in a circulating fluidized bed combustor
U. Muschelknautz, MK Engineering, Innsbruck; B. Röper, RWE Power AG, Grevenbroich
09:55

Operating experiences with the burning of wood waste in a specially designed circulating fluidized bed
R. Leithner, TU Braunschweig; G. Niehaus, Egger GmbH, Brilon
10:30
 
Operation & improvement of 480 t/h CFB boilers
S. Bao et al., Chinese Academy of Sciences, Beijing; J. Shen et al., Wuxi Huaguang Boiler Co., Wuxi
11:30


Operating experiences after measures to regain the capability of full load operation and optimization of velocity of load change of the lignite fired 300 t/h CFB at Cologne-Merkenich
G. Krebs, J. Röhler, Rheinenergie, Köln; J. Plackmeyer, Beratender Ingenieur, Bergisch-Gladbach
12:05

Operating experience of fluidized bed furnaces of municipal wastes incineration at Rudnevo plant in Russia
A.N. Tugov et al., All-Russian Thermal Engineering Institute, Moskau; A.N. Smirnov, State Unitary Enterprise “Ekotechprom”, Moskau
12:40
Ten years of experience of BOT Turow Power Plant S.A. in the operation of high-power fluidized-bed boilers
W. Nowak, Czestochowa University of Technology; R. Walkowiak et al., BOT Elektrownia Turow, Polen
14:20
Fouling in the backpass of a large-scale CFBC
R. Kobylecki et al., Czestochowa University of Technology; J. Tchórz, PKE S.A., Siersza Power Plant, Polen
14:55
Two-and-a-half years of operating experience with the RDF fired power plant Neumünster
R. Gerdes, SWN Stadtwerke Neumünster GmbH
15:30
Dynamic behavior of the particle size distribution in various parts of circulating fluidized bed combustors
K. Redemann, E.-U. Hartge, J. Werther, Technische Universität Hamburg- Harburg
16:30
Operating experience of the novel FBHE superheater at Norrköping energy-from-waste facility
S. Enestam,P. Lehtonen, Metso Power Oy; B. Heikne, E.ON Värme Sverige AB, Schweden
17:05
Experience gained with the sand system in a Foster-Wheeler boiler with circulating fluidized bed
R. Kruska, B. Petersohn, Prokon Nord, Biomasse-Heizkraftwerk Papenburg
17:40
Construction and operation of the biomass-fired CFB power plant of the Müllverwertung Borsigstrasse Hamburg
M. Mineur, W. Schmidt, Vattenfall Europe New Energy GmbH, Hamburg

 

Friday, May 16, 2008

08:30     

Improving operations of the DRSH sludge incineration plants in the Netherlands
A. van der Knijff et al., Royal Haskoning, Nijmegen und DRSH Zuiveringsslib, Dordrecht, Niederlande 
09:05
 
Reconstruction of the Flensburg plant - conversion for co-incineration of refuse derived fuels
w. Baar, D. Roschek, Stadtwerke Flensburg GmbH 
09:40

Investigation of the influence of SRF-co-combustion on chlorine corrosion risk of superheaters at a CFB boiler
A. Gerhardt et al., IVD – Universität Stuttgart; B. Röper, RWE Power AG; T. Glorius, Remondis GmbH 
10:40

Quality in refractory construction - from standard to reality
A. Trost, Trost Energy Consult, Harrislee 
11:15

Experiences on erosion protection in CFB furnaces
R. Kobylecki et al., Czestochowa University of Technology; J. Thamm et al., Rafako S.A., Racibórz, Polen 

11:50

Wastage of water walls in a commercial circulating fluidized bed combustor with two gas exits
T.-W. Kim, eTEC E&C Limited, Seoul; J.-H. Choi, Konkuk University Seoul; D. W. Shun, Korea Insitute of Energy Research, Daejeon; S.-S. Kim, SK Chemicals Ulsan; S. D. Kim, KAIST, Daejon, Korea