PSA Coordinators
The topics of the PSA working panel activities are:
-
Co-ordination of the development and the management of data bases for the application in PSA
-
Exchange of experiences on methodology, compilation and results of different kinds of PSA (e. g. power-PSA, shutdown-PSA, fire-PSA) in nuclear power plants
-
Elaboration of common statements
-
International exchange of experiences (e. g. co-operation with Nordic PSA Group)
-
Support of international research projects (e. g. ICDE, OECD-FIRE,
ASAMPSA2
)
For the purpose of generation of PSA input data different databases are operated:
-
Centralized Reliability and Events Database (
ZEDB
)
-
Development of Database about Common Cause Failure (CCF)
and additional Research Projects are performed:
-
Evaluation of characteristic values for the purpose of consideration of operational monitoring processes in the reliability data for plant components (Status: finished)
-
Evaluation of methods for the generation of leakage and break frequentness of pipes and adjustment to the conditions at NPP with PWR (2nd generation) (Status: finished)
-
Concept for assessing human errors in technical systems (Status:
VGB instruction sheet M122
(German edition) in revision)
|
|
|
|