Project-No. Brief Description Duration
221 12CrCoMo 2002-2006
198 700°C-Tube Materials (MARCKO DE 2) 1999-2004
321 725 High-temperature Material Tests GKM (725 HWT GKM) 2008-2011
220 Advanced 700 °C PF Power Plant (AD700-2) 2002-2006
258 Case Study on Condition Monitoring 2004
265 Ceramic Dielectric Dust Removal 2004-2006
212 Co-combustion Emission Control 2000-2004
235 Co-combustion of Biomasses in FBC 2002-2003
307 CO2-Avoidance by Efficiency Enhancement (CO2-RedPot) 2008-2009
248 Component Test Facility - RFCS Proposal 2003-2004
277 Comprehension Model for Slagging and Fouling (3V) 2006-2009
261 COMTES700 2004-2009
268 COMTES700-Turbine Valve 2005-2009
296 COORETEC, TD-1: NDT of Nickel-based Alloys 2006-2010
207 Corrosion by Fused Salts 2000-2001
197 Creep Behaviour of Welding Connections up to 620 °C 1998-2001
241 Creep Rupture Behaviour after Cold-forming 2003-2006
301 Creep Rupture Behaviour after Cold-forming II (Continuation 241) 2007-2010
290 Creep Tests from AD700-1 2005-2008
274 Damage Development III, Continuation 211 2005-2007
211 Damage Development of 9 % Cr Steels 2000-2003
318 Delta Ferrite 2008-2009
294 DEM Grate Simulation 2006-2008
293 Deposition of Mercury during Co-combustion 2007
313 Deposition of Mercury during Co-combustion II (Continuation 293) 2008-2009
201 Design Methods for Tube Bends 2000-2004
219 Early Detection of Fatigue 2001-2004
232 Emax Strategy Study 2002
250 Ensuring Investments 2003
260 Esbjerg Test Rig 2004-2008
282 European Lignite-fired 700 °C Power Plant 2006
269 Feasibility Study: NDT of Creep Pores 2005-2008
276 Feedwater-Pump-Monitoring-Tool 2006-2009
230 FGD-Nozzle Positioning, Continuation 202 2002-2004
263 Flow Correlated Nozzle-Positioning in FGD-scrubbers, Continuation 230 2005-2007
202 Fluid Dynamics within FGD Plants 1999-2002
291 Gas Distribution in Vessel Oil of GSU Transformers 2006-2008
243 Grid Control Technical Power Plant Reload 2003-2006
285 Grid Control Technical Power Plant Reload, Complement 243 2006
271 Innovative Control Concepts for Grate Incineration Plants 2005-2007
200 Life Assessment of 12 % Cr Steels 1999-2001
233 Life Assessment of 12 % Cr Steels (Part II), Continuation 200 2002-2004
266 Life Assessment of Cr-steels III, Continuation 233 2005-2007
273 Long-term Characteristics of Heat-resistant Steels 2005-2006
316 Long-term Characteristics of Heat-resistant Steels II (Data Mining, Continuation 273) 2008-2010
281 Material Qualification (MARCKO 700) 2004-2009
251 Materials Testing under Operating Conditions II (KOMET 650), Continuation 183 2003-2008
259 New Materials for Steam Turbines III, Continuation 217 2004-2007
217 New Materials for Steam Turbines, Continuation 158 2001-2004
297 NRW PP700 2006-2008
214 On-line Measurement of Particle Size 2001-2002
253 On-line Measurement of Particle Size II, Continuation 214 2004-2005
229 Online-Corrosion Probe 2002-2004
222 Operating Parameters of Stuffing Box Packings 2002-2004
302 Optimisation of Biomass- and Wastewood-fired CHP Plants (Part I) 2007-2008
317 Optimisation of Stem Sealing Elements 2008-2010
303 Optimisation Potentials in Determining Unit Efficiency 2007
218 PowerFlam1 2001-2003
238 PowerFlam2, Continuation 218 2003-2005
231 Pulsed Power Technology for Boiler Cleaning 2002-2004
306 Reduction of Power Station Loads from Grid Control (Continuation 285) 2007-2009
237 Reference Power Plant NRW 2002-2003
223 Refining of Phospine by Incineration of Wastes 2002
286 Self-calibrating Thermocouples for 700 °C 2006-2009
299 Stationary Fluidised Bed Firing System < 5 MW for Residues and Wastes (Part I) 2007-2009
295 Study 2030 2006-2007
236 Temperature Measuring in the Hot Steam Area 2002-2003
247 Thermocouples for Power Plants 2003-2005
228 Time Dependent Behaviour of Deposits 2002-2004
311 Ultrafine Particle Capture for High-temperature Processes (Continuation 265) 2008-2010
208 Ultrasound Laminography 2000-2003
304 Wall/Flue Gas Flow Interaction in FGD Plants, Continuation 263 2007-2009
213 Welded Connections Between Pipes 2002
283 Wind Energy Feeding and Power Plant Operation 2006-2009