| Project-No. |
Brief Description |
Duration |
| 221 |
12CrCoMo |
2002-2006
|
| 198 |
700°C-Tube Materials (MARCKO DE 2) |
1999-2004
|
| 321 |
725 High-temperature Material Tests GKM (725 HWT GKM) |
2008-2011
|
| 220 |
Advanced 700 °C PF Power Plant (AD700-2) |
2002-2006
|
| 258 |
Case Study on Condition Monitoring |
2004 |
| 265 |
Ceramic Dielectric Dust Removal |
2004-2006
|
| 212 |
Co-combustion Emission Control |
2000-2004
|
| 235 |
Co-combustion of Biomasses in FBC |
2002-2003
|
| 307 |
CO2-Avoidance by Efficiency Enhancement (CO2-RedPot) |
2008-2009
|
| 248 |
Component Test Facility - RFCS Proposal |
2003-2004
|
| 277 |
Comprehension Model for Slagging and Fouling (3V) |
2006-2009
|
| 261 |
COMTES700 |
2004-2009
|
| 268 |
COMTES700-Turbine Valve |
2005-2009
|
| 296 |
COORETEC, TD-1: NDT of Nickel-based Alloys |
2006-2010
|
| 207 |
Corrosion by Fused Salts |
2000-2001
|
| 197 |
Creep Behaviour of Welding Connections up to 620 °C |
1998-2001
|
| 241 |
Creep Rupture Behaviour after Cold-forming |
2003-2006
|
| 301 |
Creep Rupture Behaviour after Cold-forming II (Continuation 241) |
2007-2010
|
| 290 |
Creep Tests from AD700-1 |
2005-2008
|
| 274 |
Damage Development III, Continuation 211 |
2005-2007
|
| 211 |
Damage Development of 9 % Cr Steels |
2000-2003
|
| 318 |
Delta Ferrite |
2008-2009
|
| 294 |
DEM Grate Simulation |
2006-2008
|
| 293 |
Deposition of Mercury during Co-combustion |
2007 |
| 313 |
Deposition of Mercury during Co-combustion II (Continuation 293) |
2008-2009
|
| 201 |
Design Methods for Tube Bends |
2000-2004
|
| 219 |
Early Detection of Fatigue |
2001-2004
|
| 232 |
Emax Strategy Study |
2002 |
| 250 |
Ensuring Investments |
2003 |
| 260 |
Esbjerg Test Rig |
2004-2008
|
| 282 |
European Lignite-fired 700 °C Power Plant |
2006 |
| 269 |
Feasibility Study: NDT of Creep Pores |
2005-2008
|
| 276 |
Feedwater-Pump-Monitoring-Tool |
2006-2009
|
| 230 |
FGD-Nozzle Positioning, Continuation 202 |
2002-2004
|
| 263 |
Flow Correlated Nozzle-Positioning in FGD-scrubbers, Continuation 230 |
2005-2007
|
| 202 |
Fluid Dynamics within FGD Plants |
1999-2002
|
| 291 |
Gas Distribution in Vessel Oil of GSU Transformers |
2006-2008
|
| 243 |
Grid Control Technical Power Plant Reload |
2003-2006
|
| 285 |
Grid Control Technical Power Plant Reload, Complement 243 |
2006 |
| 271 |
Innovative Control Concepts for Grate Incineration Plants |
2005-2007
|
| 200 |
Life Assessment of 12 % Cr Steels |
1999-2001
|
| 233 |
Life Assessment of 12 % Cr Steels (Part II), Continuation 200 |
2002-2004
|
| 266 |
Life Assessment of Cr-steels III, Continuation 233 |
2005-2007
|
| 273 |
Long-term Characteristics of Heat-resistant Steels |
2005-2006
|
| 316 |
Long-term Characteristics of Heat-resistant Steels II (Data Mining, Continuation 273) |
2008-2010
|
| 281 |
Material Qualification (MARCKO 700) |
2004-2009
|
| 251 |
Materials Testing under Operating Conditions II (KOMET 650), Continuation 183 |
2003-2008
|
| 259 |
New Materials for Steam Turbines III, Continuation 217 |
2004-2007
|
| 217 |
New Materials for Steam Turbines, Continuation 158 |
2001-2004
|
| 297 |
NRW PP700 |
2006-2008
|
| 214 |
On-line Measurement of Particle Size |
2001-2002
|
| 253 |
On-line Measurement of Particle Size II, Continuation 214 |
2004-2005
|
| 229 |
Online-Corrosion Probe |
2002-2004
|
| 222 |
Operating Parameters of Stuffing Box Packings |
2002-2004
|
| 302 |
Optimisation of Biomass- and Wastewood-fired CHP Plants (Part I) |
2007-2008
|
| 317 |
Optimisation of Stem Sealing Elements |
2008-2010
|
| 303 |
Optimisation Potentials in Determining Unit Efficiency |
2007 |
| 218 |
PowerFlam1 |
2001-2003
|
| 238 |
PowerFlam2, Continuation 218 |
2003-2005
|
| 231 |
Pulsed Power Technology for Boiler Cleaning |
2002-2004
|
| 306 |
Reduction of Power Station Loads from Grid Control (Continuation 285) |
2007-2009
|
| 237 |
Reference Power Plant NRW |
2002-2003
|
| 223 |
Refining of Phospine by Incineration of Wastes |
2002 |
| 286 |
Self-calibrating Thermocouples for 700 °C |
2006-2009
|
| 299 |
Stationary Fluidised Bed Firing System < 5 MW for Residues and Wastes (Part I) |
2007-2009
|
| 295 |
Study 2030 |
2006-2007
|
| 236 |
Temperature Measuring in the Hot Steam Area |
2002-2003
|
| 247 |
Thermocouples for Power Plants |
2003-2005
|
| 228 |
Time Dependent Behaviour of Deposits |
2002-2004
|
| 311 |
Ultrafine Particle Capture for High-temperature Processes (Continuation 265) |
2008-2010
|
| 208 |
Ultrasound Laminography |
2000-2003
|
| 304 |
Wall/Flue Gas Flow Interaction in FGD Plants, Continuation 263 |
2007-2009
|
| 213 |
Welded Connections Between Pipes |
2002 |
| 283 |
Wind Energy Feeding and Power Plant Operation |
2006-2009
|