Suchergebnisse für 'Goedkoop zyban online 🌚⡅ www.7rx.biz/zyban 🌚⡅ zyban costo. goedkope zyban Fed Ex goedkope, generieke zyban tabletten Kopen zyban'

Maximallänge der Suchanfrage ist 128. Ihre Suchanfrage wurde gekürzt.
Maximale Wortanzahl ist 10. Ihre Suchanfrage wurde auf generieke tabletten Kopen gekürzt.

Artikel 41 bis 60 von 212 gesamt

pro Seite
Seite:
  1. 1
  2. 2
  3. 3
  4. 4
  5. 5

In aufsteigender Reihenfolge
  1. Monitoring, limiting and protection devices on steam turbine plants - Print

    Monitoring, limiting and protection devices on steam turbine plants - Print

    Bestell-Kennz.: VGB-S-103-00-2020-02-EN
    zzgl. Steuern: 270,00 € Inkl. Steuern: 288,90 € ab: 192,60 €

    This standard is addressed to manufacturers, service providers and operators of steam turbine plants and is  in particular to assist operators in equipping their steam turbine plants.

    The safe operation of steam turbines makes great demands on monitoring, limiting and protection devices.

  2. Code of Practice for Lifecycle Management  of Reinforced Concrete Cooling Towers in Power Plants - ebook

    Code of Practice for Lifecycle Management of Reinforced Concrete Cooling Towers in Power Plants - ebook

    Bestell-Kennz.: R613e-ebook
    zzgl. Steuern: 110,00 € Inkl. Steuern: 117,70 € ab: 96,30 €

    This Guideline addresses the lifecycle management of reinforced concrete cooling towers. Lifecycle management comprises maintenance of the structure and measures to ensure the safety of a cooling tower. Effective lifecycle management must be preventive and knowledge-based.

    *Dieses Produkt ist ebenfalls in deutscher Sprache erhältlich.

  3. Structural Design of Cooling Towers - ebook

    Structural Design of Cooling Towers - ebook

    Bestell-Kennz.: VGB-S-610-00-2019-10-EN-ebook
    zzgl. Steuern: 270,00 € Inkl. Steuern: 288,90 € ab: 192,60 €

    This VGB-Standard VGB-S-610, “Structural Design of Cooling Towers” constitutes the joint basis – together with VGB-R 135e and VGB-R 612e – for the civil engineering-related planning including design, construction and approval as well as for the con-struction of cooling tower facilities built from reinforced concrete.

  4. Life Cycle Management of Buildings and Structures  in Industrial Facilities and Power Plants - ebook

    Life Cycle Management of Buildings and Structures in Industrial Facilities and Power Plants - ebook

    Bestell-Kennz.: VGB-S-044-00-2019-05-EN-ebook
    zzgl. Steuern: 240,00 € Inkl. Steuern: 256,80 € ab: 171,20 €

    The VGB-Standard in hand, “Life Cycle Management of Buildings and Structures in Industrial Facilities and Power Plants”, follows the VDI Standard 6200 and the requirements described therein. The VGB-Standard clarifies and extends these requirements for application to structural works in industrial facilities and power plants.

  5. Life Cycle Management of Buildings and Structures  in Industrial Facilities and Power Plants - Print

    Life Cycle Management of Buildings and Structures in Industrial Facilities and Power Plants - Print

    Bestell-Kennz.: VGB-S-044-00-2019-05-EN
    zzgl. Steuern: 240,00 € Inkl. Steuern: 256,80 € ab: 171,20 €

    The VGB-Standard in hand, “Life Cycle Management of Buildings and Structures in Industrial Facilities and Power Plants”, follows the VDI Standard 6200 and the requirements described therein. The VGB-Standard clarifies and extends these requirements for application to structural works in industrial facilities and power plants.

  6. Structural Design of Cooling Towers - Print

    Structural Design of Cooling Towers - Print

    Bestell-Kennz.: VGB-S-610-00-2019-10-EN
    zzgl. Steuern: 270,00 € Inkl. Steuern: 288,90 € ab: 192,60 €

    This VGB-Standard VGB-S-610, “Structural Design of Cooling Towers” constitutes the joint basis – together with VGB-R 135e and VGB-R 612e – for the civil engineering-related planning including design, construction and approval as well as for the con-struction of cooling tower facilities built from reinforced concrete.

  7. Druckentladung von  Feststoffen aus  Silo-Fahrzeugen - Print

    Druckentladung von Feststoffen aus Silo-Fahrzeugen - Print

    Bestell-Kennz.: VGB-S-049-00-2019-08-DE
    zzgl. Steuern: 180,00 € Inkl. Steuern: 192,60 € ab: 128,40 €

    Dieser VGB-Standard dient dazu, die möglichen Gefahren beim Entladen aufzuzeigen und entsprechende Schutzmaßnahmen zu beschreiben.

  8. Druckentladung von  Feststoffen aus  Silo-Fahrzeugen - ebook

    Druckentladung von Feststoffen aus Silo-Fahrzeugen - ebook

    Bestell-Kennz.: VGB-S-049-00-2019-08-DE-ebook
    zzgl. Steuern: 180,00 € Inkl. Steuern: 192,60 € ab: 128,40 €

    Dieser VGB-Standard dient dazu, die möglichen Gefahren beim Entladen aufzuzeigen und entsprechende Schutzmaßnahmen zu beschreiben.

  9. Indicateurs techniques et commerciaux des centrales de production d’électricité et de chaleur - 8ère édition 2016, gratuit  - ebook

    Indicateurs techniques et commerciaux des centrales de production d’électricité et de chaleur - 8ère édition 2016, gratuit - ebook

    Bestell-Kennz.: VGB-S-002-03-2016-08-FR-ebook
    zzgl. Steuern: 0,00 € Inkl. Steuern: 0,00 €

    Ce standard VGB permet à l'utilisateur de réaliser une évaluation technique et économique des centrales. De plus, l’influence des prix de marché et des exigences légales sur le fonctionnement des centrales électriques peuvent être analysés à l’aide de ce standard VGB. En détail, l'utilisateur a à sa disposition des options d'analyse pour l'évaluation des processus d’une centrale, de son fonctionnement et la détermination de son positionnement économique.

  10. Condition Monitoring and Inspection of Components of Steam Boiler Plants, Pressure Vessel Installations and Water- or Steam-Pipes in Thermal Power Plants - 3rd edition 2019 - Print

    Condition Monitoring and Inspection of Components of Steam Boiler Plants, Pressure Vessel Installations and Water- or Steam-Pipes in Thermal Power Plants - 3rd edition 2019 - Print

    Bestell-Kennz.: VGB-S-506-00-2019-02-EN
    zzgl. Steuern: 390,00 € Inkl. Steuern: 417,30 € ab: 278,20 €

    This VGB Standard describes possibilities and methods for condition monitoring and performance of tests and inspections in due consideration of hazards especially arising from steam and pressure in components of steam boiler plants, pressure vessel installations and water- or steam pipework.

  11. Measures for the avoidance and handling of instrumentation and control equipment failures - ebook

    Measures for the avoidance and handling of instrumentation and control equipment failures - ebook

    Bestell-Kennz.: VGB-S-170-12-2018-08-EN-ebook
    zzgl. Steuern: 140,00 € Inkl. Steuern: 149,80 € ab: 96,30 €

    The former VGB Guideline VGB-R 170 A1e “Measures for the avoidance and handling of instrumentation and control equipment failures” was used since 2005 for the support during the specification and assessment of control and instrumentation systems with regard to their robustness against failures at increasing use of standard IT components and IT networks.

  12. Fire Protection in Onshore Wind Turbines - ebook

    Fire Protection in Onshore Wind Turbines - ebook

    Bestell-Kennz.: VGB-S-017-00-2018-09-EN-ebook
    zzgl. Steuern: 180,00 € Inkl. Steuern: 192,60 € ab: 128,40 €

    Fire-fighting operations by fire brigades in onshore wind turbines are almost impossible because of their height and resulting difficulty of accessing them. For this reason, fire prevention, early detection and early fighting of a fire, and the self-rescue of persons present in the installations during a fire are key considerations

  13. Fire Protection in Onshore Wind Turbines - Print

    Fire Protection in Onshore Wind Turbines - Print

    Bestell-Kennz.: VGB-S-017-00-2018-09-EN
    zzgl. Steuern: 180,00 € Inkl. Steuern: 192,60 € ab: 128,40 €

    Fire-fighting operations by fire brigades in onshore wind turbines are almost impossible because of their height and resulting difficulty of accessing them. For this reason, fire prevention, early detection and early fighting of a fire, and the self-rescue of persons present in the installations during a fire are key considerations.

  14. Indication and Application of Actions on Buildings in Power Plants - ebook

    Indication and Application of Actions on Buildings in Power Plants - ebook

    Bestell-Kennz.: VGB-S-602-00-2016-04-EN-ebook
    zzgl. Steuern: 240,00 € Inkl. Steuern: 256,80 € ab: 192,60 €

    The aim of this VGB standard is to provide a consistent procedure for the definition, classification and processing of actions on load-bearing structures for the construc-tion of power plants. It is also intended to cover significant influences of operation-induced fluctuating states like the filling levels of tanks and the frequency and pro-cesses of filling and emptying operations.

  15. Indication and Application of Actions on Buildings in Power Plants - Print

    Indication and Application of Actions on Buildings in Power Plants - Print

    Bestell-Kennz.: VGB-S-602-00-2016-04-EN
    zzgl. Steuern: 240,00 € Inkl. Steuern: 256,80 € ab: 192,60 €

    The aim of this VGB standard is to provide a consistent procedure for the definition, classification and processing of actions on load-bearing structures for the construc-tion of power plants. It is also intended to cover significant influences of operation-induced fluctuating states like the filling levels of tanks and the frequency and pro-cesses of filling and emptying operations.

  16. RDS-PP® Anwendungsrichtlinie Teil 41: Power to Gas - Application Guideline Part 41: Power to Gas - ebook

    RDS-PP® Anwendungsrichtlinie Teil 41: Power to Gas - Application Guideline Part 41: Power to Gas - ebook

    Bestell-Kennz.: VGB-S-823-41-2018-07-EN-DE-ebook
    zzgl. Steuern: 420,00 € Inkl. Steuern: 449,40 € ab: 299,60 €

    Diese RDS-PP®-Anwendungsrichtlinie für Power to Gas Anlagen wurde von einer Projektgruppe der VGB-Fachgruppe „Anlagenkennzeichnung und Dokumentation“ in enger Zusammenarbeit mit Herstellern und Betreibern erarbeitet.


    This RDS-PP® Application Guideline for Power to Gas plants was prepared by a project group of the VGB Technical Group “Reference Designation and Plant Documentation”, in close cooperation with experts from manufacturers and operators.

  17. RDS-PP® Anwendungsrichtlinie Teil 41: Power to Gas - Application Guideline Part 41: Power to Gas - Print

    RDS-PP® Anwendungsrichtlinie Teil 41: Power to Gas - Application Guideline Part 41: Power to Gas - Print

    Bestell-Kennz.: VGB-S-823-41-2018-07-EN-DE
    zzgl. Steuern: 420,00 € Inkl. Steuern: 449,40 € ab: 299,60 €

    Diese RDS-PP®-Anwendungsrichtlinie für Power to Gas Anlagen wurde von einer Projektgruppe der VGB-Fachgruppe „Anlagenkennzeichnung und Dokumentation“ in enger Zusammenarbeit mit Herstellern und Betreibern erarbeitet.


    This RDS-PP® Application Guideline for Power to Gas plants was prepared by a project group of the VGB Technical Group “Reference Designation and Plant Documentation”, in close cooperation with experts from manufacturers and operators.

  18. RDS-PP® Anwendungsrichtlinie Teil 33: Photovoltaische Kraftwerke;  Application Guideline Part 33: Photovoltaic Power Plants - ebook

    RDS-PP® Anwendungsrichtlinie Teil 33: Photovoltaische Kraftwerke; Application Guideline Part 33: Photovoltaic Power Plants - ebook

    Bestell-Kennz.: VGB-S-823-33-2018-07-EN-DE-ebook
    zzgl. Steuern: 420,00 € Inkl. Steuern: 449,40 € ab: 299,60 €

    Diese RDS-PP®-Anwendungsrichtlinie für Photovoltaische Kraftwerke wurde von einer Projektgruppe der VGB-Fachgruppe „Anlagenkennzeichnung und Dokumentation“ in enger Zusammenarbeit mit Herstellern und Betreibern erarbeitet.


    This RDS-PP® Application Guideline for photovoltaic power plants was prepared by a project group of the VGB Technical Group “Reference Designation and Plant Documentation”, in close cooperation with experts from manufacturers and operators.

  19. RDS-PP® Anwendungsrichtlinie Teil 33: Photovoltaische Kraftwerke;  Application Guideline Part 33: Photovoltaic Power Plants - Print

    RDS-PP® Anwendungsrichtlinie Teil 33: Photovoltaische Kraftwerke; Application Guideline Part 33: Photovoltaic Power Plants - Print

    Bestell-Kennz.: VGB-S-823-33-2018-07-EN-DE
    zzgl. Steuern: 420,00 € Inkl. Steuern: 449,40 € ab: 299,60 €

    Diese RDS-PP®-Anwendungsrichtlinie für Photovoltaische Kraftwerke wurde von einer Projektgruppe der VGB-Fachgruppe „Anlagenkennzeichnung und Dokumentation“ in enger Zusammenarbeit mit Herstellern und Betreibern erarbeitet.


    This RDS-PP® Application Guideline for photovoltaic power plants was prepared by a project group of the VGB Technical Group “Reference Designation and Plant Documentation”, in close cooperation with experts from manufacturers and operators.

  20. Chemical Feeding and Feed Systems for Water/Steam Circuits - ebook

    Chemical Feeding and Feed Systems for Water/Steam Circuits - ebook

    Bestell-Kennz.: VGB-S-042-00-2018-01-EN-ebook
    zzgl. Steuern: 240,00 € Inkl. Steuern: 256,80 € ab: 171,20 €

    The aim of the VGB-Standard VGB-S-042-0-2018-01-EN is to specify and explain methods and systems for the chemical treatment of make-up water, boiler feed water, steam and condensate for the operation of water/steam cycles.

Artikel 41 bis 60 von 212 gesamt

pro Seite
Seite:
  1. 1
  2. 2
  3. 3
  4. 4
  5. 5

In aufsteigender Reihenfolge