Suchergebnisse für 'Transparent face protection against droplet infection'

Artikel 1 bis 20 von 49 gesamt

pro Seite
Seite:
  1. 1
  2. 2
  3. 3

In aufsteigender Reihenfolge
  1. Monitoring, limiting and protection devices on steam turbine plants

    Monitoring, limiting and protection devices on steam turbine plants

    Bestell-Kennz.: VGB-S-103-00-2020-02-EN-ebook
    zzgl. Steuern: 270,00 € Inkl. Steuern: 283,50 € ab: 189,00 €

    This standard is addressed to manufacturers, service providers and operators of steam turbine plants and is  in particular to assist operators in equipping their steam turbine plants.

    The safe operation of steam turbines makes great demands on monitoring, limiting and protection devices.

  2. Monitoring, limiting and protection devices on steam turbine plants

    Monitoring, limiting and protection devices on steam turbine plants

    Bestell-Kennz.: VGB-S-103-00-2020-02-EN
    zzgl. Steuern: 270,00 € Inkl. Steuern: 283,50 € ab: 189,00 €

    This standard is addressed to manufacturers, service providers and operators of steam turbine plants and is  in particular to assist operators in equipping their steam turbine plants.

    The safe operation of steam turbines makes great demands on monitoring, limiting and protection devices.

  3. Elektrischer Blockschutz

    Elektrischer Blockschutz

    Bestell-Kennz.: VGB-S-162-00-2020-02-DE-ebook
    zzgl. Steuern: 270,00 € Inkl. Steuern: 283,50 € ab: 189,00 €

    5 Jahre nach der Erstveröffentlichung wurde auf Initiative der VGB-Fachgruppe „Elektrische Maschinen und Anlagen“ in einem Fachgespräch der Überarbeitungsbedarf des VGB-Standards „Elektrischer Blockschutz“ (VGB-S-025) diskutiert. Im Ergebnis wurde eine Überarbeitung und Neuausgabe mit der neuen Nummernsystematik VGB-S-162 entschieden.

  4. Elektrischer Blockschutz

    Elektrischer Blockschutz

    Bestell-Kennz.: VGB-S-162-00-2020-02-DE
    zzgl. Steuern: 270,00 € Inkl. Steuern: 283,50 € ab: 189,00 €

    5 Jahre nach der Erstveröffentlichung wurde auf Initiative der VGB-Fachgruppe „Elektrische Maschinen und Anlagen“ in einem Fachgespräch der Überarbeitungsbedarf des VGB-Standards „Elektrischer Blockschutz“ (VGB-S-025) diskutiert. Im Ergebnis wurde eine Überarbeitung und Neuausgabe mit der neuen Nummernsystematik VGB-S-162 entschieden.

  5. Code of Practice for Lifecycle Management  of Reinforced Concrete Cooling Towers in Power Plants (eBook)

    Code of Practice for Lifecycle Management of Reinforced Concrete Cooling Towers in Power Plants (eBook)

    Bestell-Kennz.: R613e-ebook
    zzgl. Steuern: 110,00 € Inkl. Steuern: 115,50 € ab: 94,50 €

    This Guideline addresses the lifecycle management of reinforced concrete cooling towers. Lifecycle management comprises maintenance of the structure and measures to ensure the safety of a cooling tower. Effective lifecycle management must be preventive and knowledge-based.

    *Dieses Produkt ist ebenfalls in deutscher Sprache erhältlich.

  6. Structural Design of Cooling Towers - eBook

    Structural Design of Cooling Towers - eBook

    Bestell-Kennz.: VGB-S-610-00-2019-10-EN-ebook
    zzgl. Steuern: 270,00 € Inkl. Steuern: 283,50 € ab: 189,00 €

    This VGB-Standard VGB-S-610, “Structural Design of Cooling Towers” constitutes the joint basis – together with VGB-R 135e and VGB-R 612e – for the civil engineering-related planning including design, construction and approval as well as for the con-struction of cooling tower facilities built from reinforced concrete.

  7. Structural Design of Cooling Towers

    Structural Design of Cooling Towers

    Bestell-Kennz.: VGB-S-610-00-2019-10-EN
    zzgl. Steuern: 270,00 € Inkl. Steuern: 283,50 € ab: 189,00 €

    This VGB-Standard VGB-S-610, “Structural Design of Cooling Towers” constitutes the joint basis – together with VGB-R 135e and VGB-R 612e – for the civil engineering-related planning including design, construction and approval as well as for the con-struction of cooling tower facilities built from reinforced concrete.

  8. Condition Monitoring and Inspection of Components of Steam Boiler Plants, Pressure Vessel Installations and Water- or Steam-Pipes in Thermal Power Plants - 3rd edition 2019

    Condition Monitoring and Inspection of Components of Steam Boiler Plants, Pressure Vessel Installations and Water- or Steam-Pipes in Thermal Power Plants - 3rd edition 2019

    Bestell-Kennz.: VGB-S-506-00-2019-02-EN
    zzgl. Steuern: 390,00 € Inkl. Steuern: 409,50 € ab: 273,00 €

    This VGB Standard describes possibilities and methods for condition monitoring and performance of tests and inspections in due consideration of hazards especially arising from steam and pressure in components of steam boiler plants, pressure vessel installations and water- or steam pipework.

  9. Measures for the avoidance and handling of instrumentation and control equipment failures

    Measures for the avoidance and handling of instrumentation and control equipment failures

    Bestell-Kennz.: VGB-S-170-12-2018-08-EN-ebook
    zzgl. Steuern: 140,00 € Inkl. Steuern: 147,00 € ab: 94,50 €

    The former VGB Guideline VGB-R 170 A1e “Measures for the avoidance and handling of instrumentation and control equipment failures” was used since 2005 for the support during the specification and assessment of control and instrumentation systems with regard to their robustness against failures at increasing use of standard IT components and IT networks.

  10. Interaction of Conformity Assessment and Industrial Safety in Hydropower Plants

    Interaction of Conformity Assessment and Industrial Safety in Hydropower Plants

    Bestell-Kennz.: VGB-S-033-00-2017-07-EN-ebook
    zzgl. Steuern: 270,00 € Inkl. Steuern: 283,50 € ab: 189,00 €

    The objective of this VGB-Standard is to provide employers a reference framework for making safe work equipment available in the field of hydropower, which indicates what concrete statutory requirements have to be observed.

  11. Interaction of Conformity Assessment and Industrial Safety in Hydropower Plants

    Interaction of Conformity Assessment and Industrial Safety in Hydropower Plants

    Bestell-Kennz.: VGB-S-033-00-2017-07-EN
    zzgl. Steuern: 270,00 € Inkl. Steuern: 283,50 € ab: 189,00 €

    The objective of this VGB-Standard is to provide employers a reference framework for making safe work equipment available in the field of hydropower, which indicates what concrete statutory requirements have to be observed.

  12. Fire Protection in Onshore Wind Turbines - eBook

    Fire Protection in Onshore Wind Turbines - eBook

    Bestell-Kennz.: VGB-S-017-00-2018-09-EN-ebook
    zzgl. Steuern: 180,00 € Inkl. Steuern: 189,00 € ab: 126,00 €

    Fire-fighting operations by fire brigades in onshore wind turbines are almost impossible because of their height and resulting difficulty of accessing them. For this reason, fire prevention, early detection and early fighting of a fire, and the self-rescue of persons present in the installations during a fire are key considerations

  13. Fire Protection in Onshore Wind Turbines

    Fire Protection in Onshore Wind Turbines

    Bestell-Kennz.: VGB-S-017-00-2018-09-EN
    zzgl. Steuern: 180,00 € Inkl. Steuern: 189,00 € ab: 126,00 €

    Fire-fighting operations by fire brigades in onshore wind turbines are almost impossible because of their height and resulting difficulty of accessing them. For this reason, fire prevention, early detection and early fighting of a fire, and the self-rescue of persons present in the installations during a fire are key considerations.

  14. Application, design and quality assurance criteria for the use of fibre-reinforced plastics in power plant construction

    Application, design and quality assurance criteria for the use of fibre-reinforced plastics in power plant construction

    Bestell-Kennz.: VGB-S-609-00-2016-03-EN-ebook
    zzgl. Steuern: 220,00 € Inkl. Steuern: 231,00 € ab: 157,50 €

    This VGB-Standard replaces the former VGB guideline VGB-R 609e, which had the same title and dates from 2003. 

  15. Application, design and quality assurance criteria for the use of fibre-reinforced plastics in power plant construction

    Application, design and quality assurance criteria for the use of fibre-reinforced plastics in power plant construction

    Bestell-Kennz.: VGB-S-609-00-2016-03-EN
    zzgl. Steuern: 220,00 € Inkl. Steuern: 231,00 € ab: 157,50 €

    This VGB-Standard replaces the former VGB guideline VGB-R 609e, which had the same title and dates from 2003. 

  16. Indication and Application of Actions on Buildings in Power Plants

    Indication and Application of Actions on Buildings in Power Plants

    Bestell-Kennz.: VGB-S-602-00-2016-04-EN-ebook
    zzgl. Steuern: 240,00 € Inkl. Steuern: 252,00 € ab: 189,00 €

    The aim of this VGB standard is to provide a consistent procedure for the definition, classification and processing of actions on load-bearing structures for the construc-tion of power plants. It is also intended to cover significant influences of operation-induced fluctuating states like the filling levels of tanks and the frequency and pro-cesses of filling and emptying operations.

  17. Indication and Application of Actions on Buildings in Power Plants

    Indication and Application of Actions on Buildings in Power Plants

    Bestell-Kennz.: VGB-S-602-00-2016-04-EN
    zzgl. Steuern: 240,00 € Inkl. Steuern: 252,00 € ab: 189,00 €

    The aim of this VGB standard is to provide a consistent procedure for the definition, classification and processing of actions on load-bearing structures for the construc-tion of power plants. It is also intended to cover significant influences of operation-induced fluctuating states like the filling levels of tanks and the frequency and pro-cesses of filling and emptying operations.

  18. Process Quality in Power Engineering - eBook

    Process Quality in Power Engineering - eBook

    Bestell-Kennz.: VGB-S-012-00-2016-02-EN-ebook
    zzgl. Steuern: 180,00 € Inkl. Steuern: 189,00 € ab: 126,00 €

    In the construction of new power plants and during the overhaul of process control systems in existing plants, the implementation of special tools for process optimization is increasingly becoming part of the instrumentation and control (I&C) contractor’s  scope of supply. Although these modules have different designations, depending  on the manufacturer or supplier, they often draw upon similar approaches, data models and processing algorithms.

  19. Process Quality in Power Engineering

    Process Quality in Power Engineering

    Bestell-Kennz.: VGB-S-012-00-2016-02-EN
    zzgl. Steuern: 180,00 € Inkl. Steuern: 189,00 € ab: 126,00 €

    In the construction of new power plants and during the overhaul of process control systems in existing plants, the implementation of special tools for process optimization is increasingly becoming part of the instrumentation and control (I&C) contractor’s  scope of supply. Although these modules have different designations, depending  on the manufacturer or supplier, they often draw upon similar approaches, data models and processing algorithms.

  20. Acceptance Test Measurements and Operational Monitoring of Water-Cooled Surface Condensers - eBook

    Acceptance Test Measurements and Operational Monitoring of Water-Cooled Surface Condensers - eBook

    Bestell-Kennz.: VGB-S-130-00-2017-07-EN-ebook
    zzgl. Steuern: 270,00 € Inkl. Steuern: 283,50 €

    More than twenty years ago, in 1994, the first edition of this standard was published in response to the rapid technological development and the growing importance of condensers in plant construction. Now that the standard has been tried and tested in many respects over the last few decades and the economic viability of a plant continues to be heavily influenced by the operation of its condensation system, it has been decided to maintain and update the standard. A fundamental revision was not necessary.

Artikel 1 bis 20 von 49 gesamt

pro Seite
Seite:
  1. 1
  2. 2
  3. 3

In aufsteigender Reihenfolge