VGB / EURELECTRIC’s Generators Network Code: Debate with consultant regarding Needs, Feasibility, Alternative Solutions and Costs

The European Commission has tasked a consortium of DNV KEMA and COWI to perform an impact assessment of the Network Codes on Requirements for Grid Connection Applicable to all Generators (RfG), which will investigate...


The European Commission has tasked a consortium of DNV KEMA and COWI to perform an impact assessment of the Network Codes on Requirements for Grid Connection Applicable to all Generators (RfG), which will investigate:

  • Need to implement the envisaged requirements
  • Technical feasibility of the requirements
  • Costs and benefits for generators as well as alternative solutions

For illustrating the arguments of the VGB / EURELECTRIC position in detail, a technical debate with the consultant was held on April 23, 2013.

Download the memorandum and presentation here:

pdficon  VGB/EURELECTRIC’s Generators Network Code:
 Needs, Feasibility, Alternative Solutions and Costs [0,44 MB]
pdficon  Presentation Eurelectric/VGB [0,32 MB]