Renewables and Distributed Generation

For full-text search within the projects please use the standard search form.
For sorting please click on one of the headings.
Project-No. Brief Description Duration
340 Availability of biomass 2011
322 Biomass Co-Firing (DEBCO) 2008-2012
280 Biomass-pellets 2006
385 BioStoMo, Part I: Screening 2014-2016
212 Co-combustion Emission Control 2000-2004
235 Co-combustion of Biomass in FBC 2002-2003
421 Condition monitoring of wind turbines II (Continuation 383) 2018-2020
383 Condition Monitoring of Wind Turbines, Part I – Best Practice Study 2014
294 DEM Grate Simulation 2006-2009
328 DEM Grate Simulation II, Continuation 294 2009-2012
377 DEM-Grate Simulation III, Continuation 328 2013-2016
288 Dena-Grid Study II 2006-2010
382 Design Optimisation of Grate Firings for Biomass – European Transfer of Results 2014-2019
428 DigiPoll@Energy 2020: Digitalization in the Energy Sector 2019-2020
252 ECOSTAR 2003-2005
250 Ensuring Investments 2003
387 FeLoSeFI 2014-2018
359 HOSEP (Self-ignition of biomass) 2012-2013
352 Hybrid High Solar Share Gas Turbine System - HYGATE 2011-2014
423 HYDROPOWER EUROPE 2018-2021
239 HySociety 2003-2005
392 Ice Detection Systems for Wind Turbines, Part I: Best Practice Study 2015
401 Ice Detection Systems for Wind Turbines, Part II: Field test and benchmark at wind park Stor-Rotliden (Continuation 392) 2016-2020
333 Impact of Large-scale Wind Farms on the German Generation System, Part II 2009-2012
396 INADAR (Hydro power plant dam restoration) 2015-2019
224 Low-calorific Gases in Micro Gas Turbines 2002-2004
246 Offshore Wind Energy (Dena-Grid Study I) 2003-2004
302 Optimisation of Biomass- and Wastewood-fired CHP Plants (Part I) 2007-2008
218 PowerFlam1 2001-2003
238 PowerFlam2, Continuation 218 2003-2005
406 Self-ignition of biomass II (Continuation 359) 2017-2019
327 Solar Hybrid Combined Cycle Power Plant (SHCC) 2009-2010
366 Standardised remote terminal unit for wind power plants 2012-2013
295 Study 2030 2006-2007
320 Sustainable and Efficient Promotion Strategies for Renewable Energies 2009
345 System stability of electricity supply 2011-2013
386 The efficiency of air filters at high relative humidity 2014-2017
418 Use of herbaceous biomass 2018-2020
283 Wind Energy Feeding and Power Plant Operation 2006-2009