Since 1970 vgbe/VGB has collected data based on standardized definitions, calculation methods, and recording procedures. With the liberalization of the energy markets the technical and economic assessment of power plants has gained more and more in importance. Intensifying the co-operation between Eurelectric and VGB it was decided to merge both associations’ data collection for the availability and unavailability of power plants. Since 2008 the data of Eurelectric´s TherPerf-Report and VGB´s KISSY-Report has been presented in one common report.
The vgbe Power Plant Statistics Performance Indicators (KISSY) is the tool to deal efficiently with these questions.
This report provides information about the availability and utilization for the period 2013 - 2022. The current report provides performance indicators for 573 power plant units plus 162 machine sets of storage and pump storage hydro power plants.
VGBE-TW 103Ve (2023): Availability of Power Plants 2013 – 2022, Edition 2023 (KISSY database evaluation). 255 p., Fig. and Tab. (2024, this report is published annually since 2005)
This vgbe-Standard is available in German and English./Dieser vgbe-Standard liegt in Deutscher und Englischer Sprache vor
Reference to series
VGB-TW 103V (2023) Verfügbarkeit von Kraftwerken 2013 – 2022
VGB-TW 103Ve (2023) Availability of Power Plants 2013 – 2022
VGB-TW 103A (2023) Analyse der Nichtverfügbarkeit von Kraftwerken 2013 – 2022
VGB-TW 103Ae (2023) Analysis of Unavailability of Power Plants 2013 – 2022
Previous editions of the reports series (VGB-TW 103Ae and VGB-TW 103Ve) are available on request, e-mail: sales-media@vgbe.energy