Suchergebnisse für 'Goedkoop zyban online 🌚⡅ www.7rx.biz/zyban 🌚⡅ zyban costo. goedkope zyban Fed Ex goedkope, generieke zyban tabletten Kopen zyban'

Maximallänge der Suchanfrage ist 128. Ihre Suchanfrage wurde gekürzt.
Maximale Wortanzahl ist 10. Ihre Suchanfrage wurde auf generieke tabletten Kopen gekürzt.

Artikel 81 bis 100 von 282 gesamt

pro Seite
Seite:
  1. 3
  2. 4
  3. 5
  4. 6
  5. 7

In aufsteigender Reihenfolge
  1. Process Quality in Power Engineering - Print

    Process Quality in Power Engineering - Print

    Bestell-Kennz.: VGB-S-012-00-2016-02-EN
    zzgl. Steuern: 180,00 € Inkl. Steuern: 192,60 € ab: 128,40 €

    In the construction of new power plants and during the overhaul of process control systems in existing plants, the implementation of special tools for process optimization is increasingly becoming part of the instrumentation and control (I&C) contractor’s  scope of supply. Although these modules have different designations, depending  on the manufacturer or supplier, they often draw upon similar approaches, data models and processing algorithms.

  2. Guide on “Pre-Job Briefing” and “Post-Job Debriefing” - ebook

    Guide on “Pre-Job Briefing” and “Post-Job Debriefing” - ebook

    Bestell-Kennz.: VGB-S-123-00-2017-06-EN-ebook
    zzgl. Steuern: 240,00 € Inkl. Steuern: 256,80 € ab: 171,20 €

    The pre-job briefing and the post-job debriefing are meetings that focus on a specific activity. The pre-job briefing (PJB) is scheduled to take place immediately before the carrying out of complex or non-routine jobs and is intended to ensure that all relevant parties involved possess the information necessary to enable implementing the measure safely, efficiently and without unexpected incidents.

  3. Guide on “Pre-Job Briefing” and “Post-Job Debriefing” - Print

    Guide on “Pre-Job Briefing” and “Post-Job Debriefing” - Print

    Bestell-Kennz.: VGB-S-123-00-2017-06-EN
    zzgl. Steuern: 240,00 € Inkl. Steuern: 256,80 € ab: 171,20 €

    The pre-job briefing and the post-job debriefing are meetings that focus on a specific activity. The pre-job briefing (PJB) is scheduled to take place immediately before the carrying out of complex or non-routine jobs and is intended to ensure that all relevant parties involved possess the information necessary to enable implementing the measure safely, efficiently and without unexpected incidents.

  4. KKS Identification System for Power Stations - 8th revised edition 2018 (ENGLISH) - Print

    KKS Identification System for Power Stations - 8th revised edition 2018 (ENGLISH) - Print

    Bestell-Kennz.: VGB-S-811-01-2018-01-EN
    zzgl. Steuern: 680,00 € Inkl. Steuern: 727,60 € ab: 524,30 €

    Owing to the national and international standardization process, the KKS Identification System for Power Stations (hereinafter referred to as “KKS”) is being replaced by the RDS-PP® Reference Designation System for Power Plants based on DIN ISO 81346-10. Thus, RDS-PP® is thus considered to be a generally accepted good engineering practice and can be applied in planning, construction, operation and dismantling of energy supply plants and equipment as a an unambiguous identification system.

    Existing power plants with identification coding to KKS will not be re-coded to RDS-PP®. Consequently, it will be necessary to continue to apply the KKS system in the event of additions to existing plants and conversion measures, I&C retrofits etc.

  5. KKS Identification System for Power Stations - 8th revised edition 2018 (ENGLISH) - ebook

    KKS Identification System for Power Stations - 8th revised edition 2018 (ENGLISH) - ebook

    Bestell-Kennz.: VGB-S-811-01-2018-01-EN-ebook
    zzgl. Steuern: 680,00 € Inkl. Steuern: 727,60 € ab: 524,30 €

    Owing to the national and international standardization process, the KKS Identification System for Power Stations (hereinafter referred to as “KKS”) is being replaced by the RDS-PP® Reference Designation System for Power Plants based on DIN ISO 81346-10. Thus, RDS-PP® is thus considered to be a generally accepted good engineering practice and can be applied in planning, construction, operation and dismantling of energy supply plants and equipment as a an unambiguous identification system.

    Existing power plants with identification coding to KKS will not be re-coded to RDS-PP®. Consequently, it will be necessary to continue to apply the KKS system in the event of additions to existing plants and conversion measures, I&C retrofits etc.

  6. KKS Kraftwerk-Kennzeichensystem - 8. überarbeitete Ausgabe 2018 (DEUTSCH) - ebook

    KKS Kraftwerk-Kennzeichensystem - 8. überarbeitete Ausgabe 2018 (DEUTSCH) - ebook

    Bestell-Kennz.: VGB-S-811-01-2018-01-DE-ebook
    zzgl. Steuern: 680,00 € Inkl. Steuern: 727,60 € ab: 524,30 €

    Durch den nationalen und internationalen Normungsprozess wird das Kraftwerk-Kennzeichen-System (nachfolgend KKS) durch das, auf DIN ISO 81346-10 basierende RDS-PP®, abgelöst. RDS-PP® gilt damit „als anerkannte Regel der Technik“ und kann bei der Planung, Errichtung, dem Betrieb und dem Rückbau von Anlagen der Energieversorgung ls eindeutiges Kennzeichnungssystem angewandt werden.

    Bestehende Kraftwerksanlagen, die mit KKS gekennzeichnet sind, werden nicht neu gekennzeichnet. Daraus entsteht die Notwendigkeit, bei Erweiterungen, Umbaumaßnahmen, leittechnischen Ertüchtigungen usw. weiterhin das KKS zu verwenden.

  7. KKS Kraftwerk-Kennzeichensystem - 8. überarbeitete Ausgabe 2018 (DEUTSCH) - Print

    KKS Kraftwerk-Kennzeichensystem - 8. überarbeitete Ausgabe 2018 (DEUTSCH) - Print

    Bestell-Kennz.: VGB-S-811-01-2018-01-DE
    zzgl. Steuern: 680,00 € Inkl. Steuern: 727,60 € ab: 524,30 €

    Durch den nationalen und internationalen Normungsprozess wird das Kraftwerk-Kennzeichen-System (nachfolgend KKS) durch das, auf DIN ISO 81346-10 basierende RDS-PP®, abgelöst. RDS-PP® gilt damit „als anerkannte Regel der Technik“ und kann bei der Planung, Errichtung, dem Betrieb und dem Rückbau von Anlagen der Energieversorgung ls eindeutiges Kennzeichnungssystem angewandt werden.

    Bestehende Kraftwerksanlagen, die mit KKS gekennzeichnet sind, werden nicht neu gekennzeichnet. Daraus entsteht die Notwendigkeit, bei Erweiterungen, Umbaumaßnahmen, leittechnischen Ertüchtigungen usw. weiterhin das KKS zu verwenden.

  8. Acceptance Test Measurements and Operational Monitoring of Air-Cooled Condensers under Vacuum - ebook

    Acceptance Test Measurements and Operational Monitoring of Air-Cooled Condensers under Vacuum - ebook

    Bestell-Kennz.: VGB-S-131-00-2017-07-EN-ebook
    zzgl. Steuern: 270,00 € Inkl. Steuern: 288,90 € ab: 192,60 €

    This guideline is meant to provide a standardized basis for acceptance and operating tests of air-cooled water steam condensers. Its scope of application is limited to the testing of the condenser itself and the exhaust steam duct up to the terminal point of supply.

  9. Acceptance Test Measurements and Operational Monitoring of Air-Cooled Condensers under Vacuum - Print

    Acceptance Test Measurements and Operational Monitoring of Air-Cooled Condensers under Vacuum - Print

    Bestell-Kennz.: VGB-S-131-00-2017-07-EN
    zzgl. Steuern: 270,00 € Inkl. Steuern: 288,90 € ab: 192,60 €

    This guideline is meant to provide a standardized basis for acceptance and operating tests of air-cooled water steam condensers. Its scope of application is limited to the testing of the condenser itself and the exhaust steam duct up to the terminal point of supply.

  10. vgbe energy journal (CD 2022) - Print

    vgbe energy journal (CD 2022) - Print

    Bestell-Kennz.: PT-CD
    zzgl. Steuern: 198,00 € Inkl. Steuern: 211,86 € ab: 104,86 €

    CD der VGB POWERTECH 2019.

    Auf mehr als 1.000 Seiten finden Sie das kompetente Fachwissen aus dem Jahrgang 2019 der Fachzeitschrift VGB POWERTECH:

    • über 100 Fachartikeln
    • alle Dokumenten im hochauflösenden PDF-Format,
    • einer komfortablen Suchfunktion über alle Beiträge, als Volltextsuche bzw. gezielter Suchen nach Autoren und Dokumententiteln.
  11. Acceptance Test Measurements and Operational Monitoring of Water-Cooled Surface Condensers - ebook

    Acceptance Test Measurements and Operational Monitoring of Water-Cooled Surface Condensers - ebook

    Bestell-Kennz.: VGB-S-130-00-2017-07-EN-ebook
    zzgl. Steuern: 270,00 € Inkl. Steuern: 288,90 €

    More than twenty years ago, in 1994, the first edition of this standard was published in response to the rapid technological development and the growing importance of condensers in plant construction. Now that the standard has been tried and tested in many respects over the last few decades and the economic viability of a plant continues to be heavily influenced by the operation of its condensation system, it has been decided to maintain and update the standard. A fundamental revision was not necessary.

  12. Acceptance Test Measurements and Operational Monitoring of Water-Cooled Surface Condensers - Print

    Acceptance Test Measurements and Operational Monitoring of Water-Cooled Surface Condensers - Print

    Bestell-Kennz.: VGB-S-130-00-2017-07-EN
    zzgl. Steuern: 270,00 € Inkl. Steuern: 288,90 € ab: 192,60 €

    More than twenty years ago, in 1994, the first edition of this standard was published in response to the rapid technological development and the growing importance of condensers in plant construction. Now that the standard has been tried and tested in many respects over the last few decades and the economic viability of a plant continues to be heavily influenced by the operation of its condensation system, it has been decided to maintain and update the standard. A fundamental revision was not necessary.

  13. Preservation of Steam and Gas Turbo-Generator Sets - 2nd edition - ebook

    Preservation of Steam and Gas Turbo-Generator Sets - 2nd edition - ebook

    Bestell-Kennz.: VGB-S-036-00-2017-04-EN-ebook
    zzgl. Steuern: 280,00 € Inkl. Steuern: 299,60 € ab: 203,30 €

    The editorial team has decided to take the steam turbine and the generator from the VGB-R 116 “Preservation of Power Plants” (republished as VGB-S-116-00-2016-04- EN “Preservation of Power Plants”), to add a section on the gas turbine and to publish both together in this revised VGB standard “VGB-S-036-00-2017-04”. 

  14. Preservation of Steam and Gas Turbo-Generator Sets - 2nd edition - Print

    Preservation of Steam and Gas Turbo-Generator Sets - 2nd edition - Print

    Bestell-Kennz.: VGB-S-036-00-2017-04-EN
    zzgl. Steuern: 280,00 € Inkl. Steuern: 299,60 € ab: 203,30 €

    The editorial team has decided to take the steam turbine and the generator from the VGB-R 116 “Preservation of Power Plants” (republished as VGB-S-116-00-2016-04- EN “Preservation of Power Plants”), to add a section on the gas turbine and to publish both together in this revised VGB standard “VGB-S-036-00-2017-04”. 

  15. Auslegungsstandards für die Leittechnik – Sammelband – - ebook

    Auslegungsstandards für die Leittechnik – Sammelband – - ebook

    Bestell-Kennz.: VGB-S-170-20-2017-02-DE-ebook
    zzgl. Steuern: 580,00 € Inkl. Steuern: 620,60 € ab: 417,30 €

    Die VGB-Fachgruppe „Leittechnik“ (ehemals VGB-Arbeitskreis „Leit- und Informationstechnik“) hatte zu entscheiden, ob und in welcher Form eine Überarbeitung der VGB-Richtlinien der Reihe VGB-R 170 B „Auslegungsstandards für die Leittechnik“ erfolgen sollte. Unter Berücksichtigung des geänderten Marktumfeldes war zu diskutieren, ob die Zielstellung und der erwartete Nutzen aus der Standardisierung von Vorgaben und Prozessen weiterhin Gültigkeit haben oder ggf. neue Lösungsansätze im Sinne „Industriestandard“ bzw. „Herstellerstandard“ aus Sicht der Betreiber von Erzeugungsanlagen ebenso akzeptabel sind.
    Im Ergebnis der Diskussion bestätigte die VGB-Fachgruppe „Leittechnik“ die grundsätzlichen Ziele und die beschriebene Herangehensweise an die Erstellung leittechnischer Lösungen.
    Die daraufhin eingesetzte Projektgruppe konzentrierte sich damit auf Aktualisierung und ggf. Fehlerkorrektur des bestehenden Werkes. Dies schließt Ergänzungen und Präzisierungen dort ein, wo nach den Anwendungserfahrungen ein Bedarf nach einem höheren Detaillierungsgrad erkennbar war. Ebenso wurde auf Vorgaben verzichtet, wenn deren Anwendung zu ungewollten Einschränkungen bei der Umsetzung der Spezifikationen führen kann.

  16. Auslegungsstandards für die Leittechnik – Sammelband – - Print

    Auslegungsstandards für die Leittechnik – Sammelband – - Print

    Bestell-Kennz.: VGB-S-170-20-2017-02-DE
    zzgl. Steuern: 580,00 € Inkl. Steuern: 620,60 € ab: 417,30 €

    Die VGB-Fachgruppe „Leittechnik“ (ehemals VGB-Arbeitskreis „Leit- und Informationstechnik“) hatte zu entscheiden, ob und in welcher Form eine Überarbeitung der VGB-Richtlinien der Reihe VGB-R 170 B „Auslegungsstandards für die Leittechnik“ erfolgen sollte. Unter Berücksichtigung des geänderten Marktumfeldes war zu diskutieren, ob die Zielstellung und der erwartete Nutzen aus der Standardisierung von Vorgaben und Prozessen weiterhin Gültigkeit haben oder ggf. neue Lösungsansätze im Sinne „Industriestandard“ bzw. „Herstellerstandard“ aus Sicht der Betreiber von Erzeugungsanlagen ebenso akzeptabel sind.
    Im Ergebnis der Diskussion bestätigte die VGB-Fachgruppe „Leittechnik“ die grundsätzlichen Ziele und die beschriebene Herangehensweise an die Erstellung leittechnischer Lösungen.
    Die daraufhin eingesetzte Projektgruppe konzentrierte sich damit auf Aktualisierung und ggf. Fehlerkorrektur des bestehenden Werkes. Dies schließt Ergänzungen und Präzisierungen dort ein, wo nach den Anwendungserfahrungen ein Bedarf nach einem höheren Detaillierungsgrad erkennbar war. Ebenso wurde auf Vorgaben verzichtet, wenn deren Anwendung zu ungewollten Einschränkungen bei der Umsetzung der Spezifikationen führen kann.

  17. VGB-Standard for the Internal Pipework of Turbine Systems - ebook

    VGB-Standard for the Internal Pipework of Turbine Systems - ebook

    Bestell-Kennz.: VGB-S-503-00-2017-06-EN-ebook
    zzgl. Steuern: 390,00 € Inkl. Steuern: 417,30 € ab: 278,20 €

    Over a lengthier period experience was gained with VGB-Guideline VGB-R 503e which is now taken into account in this edition of VGB-Standard VGB-S-503-00- 2017-06-EN.
  18. VGB-Standard for the Internal Pipework of Turbine Systems - Print

    VGB-Standard for the Internal Pipework of Turbine Systems - Print

    Bestell-Kennz.: VGB-S-503-00-2017-06-EN
    zzgl. Steuern: 390,00 € Inkl. Steuern: 417,30 € ab: 278,20 €

    Over a lengthier period experience was gained with VGB-Guideline VGB-R 503e which is now taken into account in this edition of VGB-Standard VGB-S-503-00- 2017-06-EN.
  19. Technical and Commercial Key Indicators for Power Plants - 9th edition 2019, free of charge - ebook

    Technical and Commercial Key Indicators for Power Plants - 9th edition 2019, free of charge - ebook

    Bestell-Kennz.: VGB-S-002-03-2019-10-EN-ebook
    zzgl. Steuern: 0,00 € Inkl. Steuern: 0,00 €

    This VGB-Standard allows the user to make a technical and economic assessment of power plants. In addition, the effect of price effects and the legal requirements on the power plant operation can be analyzed using the VGB-Standard. In detail, the user receives analysis options in the assessment of power plant processes, the assessment of plant operation and the determination of economic success.

    The operation of power plants or the utilization of different technologies in energy conversion depends on a number of restrictions, in the competitive environment, primarily on the costs as well as on the specific political framework in the electricity markets.

  20. Technische und kommerzielle Kennzahlen für Kraftwerksanlagen - 9. Ausgabe 2019, kostenlos - ebook

    Technische und kommerzielle Kennzahlen für Kraftwerksanlagen - 9. Ausgabe 2019, kostenlos - ebook

    Bestell-Kennz.: VGB-S-002-03-2019-10-DE-ebook
    zzgl. Steuern: 0,00 € Inkl. Steuern: 0,00 €

    Der VGB-Standard ermöglicht dem Anwender eine technische und wirtschaftliche Beurteilung von Kraftwerksanlagen. Zudem kann mithilfe des VGB-Standards die Wirkung von Preiseffekten und den gesetzlichen Vorgaben auf den Kraftwerksbetrieb analysiert werden. Im Detail erhält der Anwender Analysemöglichkeiten in der Beurteilung von Kraftwerksprozessen, zur Bewertung des Anlagenbetriebes und für die Bestimmung des wirtschaftlichen Erfolges.

Artikel 81 bis 100 von 282 gesamt

pro Seite
Seite:
  1. 3
  2. 4
  3. 5
  4. 6
  5. 7

In aufsteigender Reihenfolge